EV charging site
124 Lewisham Way
Lewisham Way, New Cross, SE14 6PD
124 Lewisham Way is an EV charging site in New Cross, Greater London. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 63 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Vanguard Street Car Park (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.29/kWh; other tariffs available(from Open Charge Map, 22 Nov 2018)
- Notes
- ESB charger.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 124 Lewisham Way?
The listed price is £0.29/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at 124 Lewisham Way?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does 124 Lewisham Way have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Where is the nearest other charger with 50 kW or more to 124 Lewisham Way?
Vanguard Street Car Park (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 124 Lewisham Way?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 124 Lewisham Way?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 124 Lewisham Way?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 88 Shardeloes Road
- Vanguard Street Car Park
- ubitricity Distributed Energy Systems UK Ltd. 77 Albyn Road
- ubitricity Distributed Energy Systems UK Ltd. 53 Admiral Street, Junc. Albyn Road
- ubitricity Distributed Energy Systems UK Ltd. 28A Wickham Road
- ubitricity Distributed Energy Systems UK Ltd. 123 Albyn Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 88 Shardeloes Road · 56p per kWh · 5 kW · 0.2 mi