EV charging site
21 High Street
High Street, Tooting, SW19 2JE
21 High Street is an EV charging site in Tooting, Greater London. It has a single socket, with CHAdeMO and CCS at up to 50 kW. 290 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is [E-TAXI ONLY] 34 Christchurch Road (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.29/kWh; other tariffs available(from Open Charge Map, 8 Nov 2019)
- Notes
- ESB EV Solutions charger
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 21 High Street?
The listed price is £0.29/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at 21 High Street?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does 21 High Street have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Where is the nearest other charger with 50 kW or more to 21 High Street?
[E-TAXI ONLY] 34 Christchurch Road (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 21 High Street?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 21 High Street?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 21 High Street?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Warren, Junction With Park Road
- 99 Park Road
- Park Road Colliers Wood
- Opposite 79 Denison Road
- Opposite 16 Marlborough Road
- Briscoe Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Warren, Junction With Park Road · 56p per kWh · 5 kW · 80 yd