EV charging site
232-236 Gipsy Rd
West Norwood, Upper Norwood, SE27 9BJ
232-236 Gipsy Rd is an EV charging site in Upper Norwood, Greater London. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 62 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 234 Norwood Road (A215), West Norwood (ESB Energy), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- ESB: 29p per kWh, or 25p per kWh with membership (£4 per month).(from Open Charge Map, 30 Dec 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 232-236 Gipsy Rd?
The listed price is ESB: 29p per kWh, or 25p per kWh with membership (£4 per month).. Prices can change, so check the price at the charger before you start.
How fast is charging at 232-236 Gipsy Rd?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does 232-236 Gipsy Rd have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Where is the nearest other charger with 50 kW or more to 232-236 Gipsy Rd?
234 Norwood Road (A215), West Norwood (ESB Energy) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 232-236 Gipsy Rd?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 232-236 Gipsy Rd?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 232-236 Gipsy Rd?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.