EV charging site
37 Croydon Road (A232 Eastbound), West Wickham
37 Croydon Road (A232 Eastbound), West Wickham, Hayes, BR4 9HZ
37 Croydon Road (A232 Eastbound), West Wickham is an EV charging site in Hayes, Greater London. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 29 West Wickham High Street (BP Pulse), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 37 Croydon Road (A232 Eastbound), West Wickham?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does 37 Croydon Road (A232 Eastbound), West Wickham have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Where is the nearest other charger with 50 kW or more to 37 Croydon Road (A232 Eastbound), West Wickham?
29 West Wickham High Street (BP Pulse) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 37 Croydon Road (A232 Eastbound), West Wickham?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 37 Croydon Road (A232 Eastbound), West Wickham?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 37 Croydon Road (A232 Eastbound), West Wickham?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.