EV charging site
4-5 Glenmore Parade
Ealing Road, Wembley, HA0 4PJ
4-5 Glenmore Parade is an EV charging site in Wembley, Greater London. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.25/kWh. 40 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is McDonalds Alperton (InstaVolt Ltd), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.25/kWh(from Open Charge Map, 3 Dec 2018)
- Notes
- ESB charger.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 4-5 Glenmore Parade?
The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 4-5 Glenmore Parade?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does 4-5 Glenmore Parade have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.
Where is the nearest other charger with 50 kW or more to 4-5 Glenmore Parade?
McDonalds Alperton (InstaVolt Ltd) is 0.6 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 4-5 Glenmore Parade?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 4-5 Glenmore Parade?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 4-5 Glenmore Parade?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 89 Norton Road
- Douglas Avenue
- ubitricity Distributed Energy Systems UK Ltd. 88 Scarle Road
- ubitricity Distributed Energy Systems UK Ltd. 89 Thurlby Road
- ubitricity Distributed Energy Systems UK Ltd. 73 Scarle Road
- ubitricity Distributed Energy Systems UK Ltd. 1 Bassingham Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 89 Norton Road · 45p per kWh · 5 kW · 0.3 mi