Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

40 kW Project EV Atess

Medina Way, Newport, PO30 5TA

40 kW Project EV Atess is an EV charging site in Newport, Isle of Wight. It has a single 36 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Sandown (GeniePoint), 3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 2 Nov 2023Last verified 2 Nov 2023

Connectors

Type 2 · 36 kW1 connector

Site information

Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Getting there
The 40 kW Project EV Atess dc electric vehicle charging station is located in E block business centre car park on the lhs as you enter through the main college entrance gates

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 36 kW Type 2~1h 37m
Tesla Model 3 Rear-Wheel Drive 10–80% · 36 kW Type 2~70 min
Audi Q4 e-tron 50 10–80% · 36 kW Type 2~1h 30m
Hyundai IONIQ 5 10–80% · 36 kW Type 2~89 min
MG Motor MG4 Trophy 10–80% · 36 kW Type 2~75 min
Hyundai Kona Electric Long Range 10–80% · 36 kW Type 2~72 min
Nissan LEAF 10–80% · 36 kW Type 2~61 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at 40 kW Project EV Atess?

Up to 36 kW DC via Type 2.

How many charging sockets does 40 kW Project EV Atess have?

1 charging socket: 1 × 36 kW Type 2.

Where is the nearest charger with 50 kW or more to 40 kW Project EV Atess?

Morrisons Sandown (GeniePoint) is 3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at 40 kW Project EV Atess?

A typical 10–80% rapid charge takes about 1h 37m on the 36 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 40 kW Project EV Atess?

A typical 10–80% rapid charge takes about 70 min on the 36 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 40 kW Project EV Atess?

A typical 10–80% rapid charge takes about 1h 30m on the 36 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 2 Nov 2023

Amp Map does not take payment. You pay the operator.