# Abaseen Superstore · Alfapower

Web page: https://ampmap.co.uk/charger/alfapower-abaseen-superstore-uk

Abaseen Superstore is an EV charging site in Chapel Allerton, City and Borough of Leeds, run by Alfapower. It has a single 22 kW Type 2 socket, and the price is listed as Alfa Power: 25p/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 171 Harehills Lane, LS8 3QE
- **Area:** Chapel Allerton, City and Borough of Leeds, United Kingdom
- **Coordinates (latitude, longitude):** 53.81643, -1.51382
- **Getting there:** Store open 09:00-20:00. Charger accessible 24/7.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** Alfa Power: 25p/kWh (from Open Charge Map)

## Site information

- **Operator:** Alfapower
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Alfa Power 22kw AC post. Contactless, App or RFID. www.alfapower.co.uk/app

## Common questions

### How much does it cost to charge at Abaseen Superstore (Alfapower)?

The listed price is Alfa Power: 25p/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Abaseen Superstore (Alfapower)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Abaseen Superstore (Alfapower) have?

1 charging socket: 1 × 22 kW Type 2.

### Who operates Abaseen Superstore?

Abaseen Superstore is on the Alfapower network.

### How long does a Tesla Model Y Long Range take to charge at Abaseen Superstore (Alfapower)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Abaseen Superstore (Alfapower)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Abaseen Superstore (Alfapower)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Chapel Allerton](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-leeds/chapel-allerton)
- [Alfapower chargers](https://ampmap.co.uk/networks/alfapower)

## Chargers near this site

- [Morrisons Leeds Harehills · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-leeds-harehills-uk) - CCS 50 kW, CHAdeMO 50 kW · Harehills Lane
- [Pod Point Tesco Superstore - Leeds](https://ampmap.co.uk/charger/pod-point-tesco-superstore-leeds-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · 361 Roundhay Rd · From 44.4p/kWh
- [Asda Harehills Lane · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-asda-harehills-lane-uk) - CCS 50 kW, CHAdeMO 50 kW · Lupton Avenue
- [Roundhay Park Clocktower carpark · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-roundhay-park-clocktower-carpark-uk) - CHAdeMO 50 kW, CEE 3 Pin 50 kW · 1 Gledhow Lane
- [Nowell Filling Station · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-nowell-filling-station-uk) - CCS 50 kW, CHAdeMO 50 kW · Harehills Lane
- [Bristol Street · Alfapower](https://ampmap.co.uk/charger/alfapower-bristol-street-uk) - CCS 100 kW, CHAdeMO 60 kW · Sheepscar Junction

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/alfapower-abaseen-superstore-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Jan 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
