Alfapower · EV charging site
New Rover Cricket Club
Smithy Mills Ln, Chapel Allerton, LS16 8HF
New Rover Cricket Club is an EV charging site in Chapel Allerton, City and Borough of Leeds, run by Alfapower. Both of its sockets are 22 kW Type 2, and the price is listed as 25p per kWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Horsforth, 1.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Alfapower
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- 25p per kWh(from Open Charge Map, 10 Oct 2020)
- Notes
- Alfa Power : 1 X double 22kw post Open Socket (22kW) Open Socket (22kW)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at New Rover Cricket Club (Alfapower)?
The listed price is 25p per kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at New Rover Cricket Club (Alfapower)?
Up to 22 kW AC via Type 2.
How many charging sockets does New Rover Cricket Club (Alfapower) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates New Rover Cricket Club?
New Rover Cricket Club is on the Alfapower network.
Where is the nearest charger with 50 kW or more to New Rover Cricket Club (Alfapower)?
Shell Recharge Shell Horsforth is 1.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at New Rover Cricket Club (Alfapower)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Rover Cricket Club (Alfapower)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at New Rover Cricket Club (Alfapower)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Moor Grange · Free · 7 kW · 1.1 mi