# The Grammar School at Leeds · Alfapower

Web page: https://ampmap.co.uk/charger/alfapower-the-grammar-school-at-leeds-uk

The Grammar School at Leeds is an EV charging site in Chapel Allerton, City and Borough of Leeds, run by Alfapower. All 4 of its sockets are 22 kW Type 2, and the price is listed as 25p per kw.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Harrogate Road, LS17 8GS
- **Area:** Chapel Allerton, City and Borough of Leeds, United Kingdom
- **Coordinates (latitude, longitude):** 53.86488, -1.51869
- **Getting there:** Private Charger

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 4 | Not listed |

- **Price:** 25p per kw (from Open Charge Map)

## Site information

- **Operator:** Alfapower
- **Opening hours:** Not published
- **Access:** Customers only

## Common questions

### How much does it cost to charge at The Grammar School at Leeds (Alfapower)?

The listed price is 25p per kw. Prices can change, so check the price at the charger before you start.

### How fast is charging at The Grammar School at Leeds (Alfapower)?

Up to 22 kW AC via Type 2.

### How many charging sockets does The Grammar School at Leeds (Alfapower) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2.

### Who operates The Grammar School at Leeds?

The Grammar School at Leeds is on the Alfapower network.

### Can anyone charge at The Grammar School at Leeds (Alfapower)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at The Grammar School at Leeds (Alfapower)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Grammar School at Leeds (Alfapower)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at The Grammar School at Leeds (Alfapower)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Chapel Allerton](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-leeds/chapel-allerton)
- [Alfapower chargers](https://ampmap.co.uk/networks/alfapower)

## Chargers near this site

- [Lord Darcy (Leeds) · evyve](https://ampmap.co.uk/charger/evyve-lord-darcy-leeds-uk) - CCS 75 kW, CHAdeMO 75 kW · Harrogate Road 618 · From 85p/kWh
- [Leeds Golf Centre · Alfapower](https://ampmap.co.uk/charger/alfapower-leeds-golf-centre-uk) - Type 2 22 kW · Shadwell
- [M&S Leeds Moortown SF · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-m-and-s-leeds-moortown-sf-uk) - CCS 50 kW, CHAdeMO 50 kW · 371 Harrogate Road
- [Pod Point Aldi - Chapel Allerton](https://ampmap.co.uk/charger/pod-point-aldi-chapel-allerton-uk) - Type 2 7 kW · Harrogate Road Chapel Allerton · From 25.2p/kWh
- [Roundhay Park Clocktower carpark · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-roundhay-park-clocktower-carpark-uk) - CHAdeMO 50 kW, CEE 3 Pin 50 kW · 1 Gledhow Lane
- [Pod Point Tesco Superstore - Leeds](https://ampmap.co.uk/charger/pod-point-tesco-superstore-leeds-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · 361 Roundhay Rd · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/alfapower-the-grammar-school-at-leeds-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
