Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Allego BV · EV charging site

98-200A, The Broadway

98-200A, The Broadway, Didcot, OX11 8RN

98-200A, The Broadway is an EV charging site in Didcot, Oxfordshire, run by Allego BV. Both of its sockets are 150 kW CCS, and the price is listed as £0.84/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Station Garden, Didcot (Osprey Charging), 1.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 20 Dec 2024Last verified 20 Dec 2024

Connectors

CCS · 150 kW2 connectors

Site information

Operator
Allego BV
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Price
£0.84/kWh(from Open Charge Map, 20 Dec 2024)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at 98-200A, The Broadway (Allego BV)?

The listed price is £0.84/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at 98-200A, The Broadway (Allego BV)?

Up to 150 kW DC via CCS.

How many charging sockets does 98-200A, The Broadway (Allego BV) have?

2 charging sockets: 1 × 150 kW CCS, 1 × 150 kW CCS.

Who operates 98-200A, The Broadway?

98-200A, The Broadway is on the Allego BV network.

Where is the nearest other charger with 50 kW or more to 98-200A, The Broadway (Allego BV)?

Station Garden, Didcot (Osprey Charging) is 1.1 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at 98-200A, The Broadway (Allego BV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 98-200A, The Broadway (Allego BV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 98-200A, The Broadway (Allego BV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 20 Dec 2024

Amp Map does not take payment. You pay the operator.