Allego BV · EV charging site
98-200A, The Broadway
98-200A, The Broadway, Didcot, OX11 8RN
98-200A, The Broadway is an EV charging site in Didcot, Oxfordshire, run by Allego BV. Both of its sockets are 150 kW CCS, and the price is listed as £0.84/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Station Garden, Didcot (Osprey Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Allego BV
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.84/kWh(from Open Charge Map, 20 Dec 2024)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 98-200A, The Broadway (Allego BV)?
The listed price is £0.84/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 98-200A, The Broadway (Allego BV)?
Up to 150 kW DC via CCS.
How many charging sockets does 98-200A, The Broadway (Allego BV) have?
2 charging sockets: 1 × 150 kW CCS, 1 × 150 kW CCS.
Who operates 98-200A, The Broadway?
98-200A, The Broadway is on the Allego BV network.
Where is the nearest other charger with 50 kW or more to 98-200A, The Broadway (Allego BV)?
Station Garden, Didcot (Osprey Charging) is 1.1 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 98-200A, The Broadway (Allego BV)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 98-200A, The Broadway (Allego BV)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 98-200A, The Broadway (Allego BV)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- RAW Greene King Prince Wales 1
- Pod Point The Orchard Centre
- Pod Point Tesco Superstore - Didcot
- Station Garden, Didcot
- Pod Point Milton Park - 141 Park Drive
- Pod Point Milton Park - 143 Park Drive
- Cheapest nearby
- Pod Point The Orchard Centre · Free · 7 kW · 0.3 mi