# 98-200A, The Broadway · Allego BV

Web page: https://ampmap.co.uk/charger/allego-bv-98-200a-the-broadway-uk

98-200A, The Broadway is an EV charging site in Didcot, Oxfordshire, run by Allego BV. Both of its sockets are 150 kW CCS, and the price is listed as £0.84/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 98-200A, The Broadway, OX11 8RN
- **Area:** Didcot, Oxfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.60687, -1.24390

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed |

- **Price:** £0.84/kWh (from Open Charge Map)

## Site information

- **Operator:** Allego BV
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at 98-200A, The Broadway (Allego BV)?

The listed price is £0.84/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at 98-200A, The Broadway (Allego BV)?

Up to 150 kW DC via CCS.

### How many charging sockets does 98-200A, The Broadway (Allego BV) have?

2 charging sockets: 1 × 150 kW CCS, 1 × 150 kW CCS.

### Who operates 98-200A, The Broadway?

98-200A, The Broadway is on the Allego BV network.

### How long does a Tesla Model Y Long Range take to charge at 98-200A, The Broadway (Allego BV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 98-200A, The Broadway (Allego BV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 98-200A, The Broadway (Allego BV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Didcot](https://ampmap.co.uk/chargers/united-kingdom/oxfordshire/didcot)
- [Cheapest charging in Didcot](https://ampmap.co.uk/chargers/united-kingdom/oxfordshire/didcot/cheapest)
- [Allego BV chargers](https://ampmap.co.uk/networks/allego-bv)

## Chargers near this site

- [RAW Greene King Prince Wales 1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-raw-greene-king-prince-wales-1-uk) - Type 2 22 kW · Station Road
- [Pod Point The Orchard Centre](https://ampmap.co.uk/charger/pod-point-the-orchard-centre-2-uk) - Type 2 7 kW · The Orchard Centre · Free to use
- [Pod Point Tesco Superstore - Didcot](https://ampmap.co.uk/charger/pod-point-tesco-superstore-didcot-uk) - Type 2 7 kW · Wallingford Road North Moreton · From 44.4p/kWh
- [Station Garden, Didcot · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-station-garden-didcot-uk) - CCS 120 kW · 2 Gentian Mews · From 89p/kWh
- [Pod Point Milton Park - 141 Park Drive](https://ampmap.co.uk/charger/pod-point-milton-park-141-park-drive-uk) - Type 2 22 kW · 141 Park Drive Milton Park · From 50.4p/kWh
- [Pod Point Milton Park - 143 Park Drive](https://ampmap.co.uk/charger/pod-point-milton-park-143-park-drive-2-uk) - Type 2 22 kW · 143 Park Drive Milton Park · From 50.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/allego-bv-98-200a-the-broadway-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 20 Dec 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.