# Shell Recharge, Maresfield Bypass · Allego BV

Web page: https://ampmap.co.uk/charger/allego-bv-shell-recharge-maresfield-bypass-uk

Shell Recharge, Maresfield Bypass is an EV charging site in Uckfield, East Sussex, run by Allego BV. Its 2 sockets reach up to 150 kW, with CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Maresfield Bypass, TN22 5EP
- **Area:** Uckfield, East Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 50.98883, 0.09033

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 150 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |

- **Price:** CCS 150 kW: £0.85/kWh; CHAdeMO 50 kW: £0.79/kWh (2023-03-02) (from Open Charge Map)

## Site information

- **Operator:** Allego BV
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Shell Recharge, Maresfield Bypass (Allego BV)?

The listed price is CCS 150 kW: £0.85/kWh; CHAdeMO 50 kW: £0.79/kWh (2023-03-02). Prices can change, so check the price at the charger before you start.

### How fast is charging at Shell Recharge, Maresfield Bypass (Allego BV)?

Up to 150 kW DC via CCS, CHAdeMO.

### How many charging sockets does Shell Recharge, Maresfield Bypass (Allego BV) have?

2 charging sockets: 1 × 150 kW CCS, 1 × 50 kW CHAdeMO.

### Who operates Shell Recharge, Maresfield Bypass?

Shell Recharge, Maresfield Bypass is on the Allego BV network.

### How long does a Tesla Model Y Long Range take to charge at Shell Recharge, Maresfield Bypass (Allego BV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge, Maresfield Bypass (Allego BV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge, Maresfield Bypass (Allego BV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Uckfield](https://ampmap.co.uk/chargers/united-kingdom/east-sussex/uckfield)
- [Allego BV chargers](https://ampmap.co.uk/networks/allego-bv)

## Chargers near this site

- [Shell Recharge Shell Blackdown](https://ampmap.co.uk/charger/shell-recharge-shell-blackdown-uk) - CCS 150 kW · Maresfield Bypass · From 89p/kWh
- [Pod Point Tesco Superstore - Uckfield](https://ampmap.co.uk/charger/pod-point-tesco-superstore-uckfield-uk) - Type 2 7 kW · Bell Farm Road · From 44.4p/kWh
- [Ums Uckfield 2 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-ums-uckfield-2-uk) - Type 2 11 kW · 3-4 Bell Ln, Bellbrook Industrial Estate
- [Ums Uckfield 1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-ums-uckfield-1-uk) - Type 2 11 kW · 3-4 Bell Ln, Bellbrook Industrial Estate
- [InstaVolt Bell Walk House · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-instavolt-bell-walk-house-uk) - CCS 120 kW, CHAdeMO 50 kW · 9 Bell Walk
- [Denmans Lane Car Park 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-denmans-lane-car-park-1-uk) - Type 2 7 kW · Denmans Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/allego-bv-shell-recharge-maresfield-bypass-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Sept 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
