# Shell St Andrews Cross · Allego BV

Web page: https://ampmap.co.uk/charger/allego-bv-shell-st-andrews-cross-uk

Shell St Andrews Cross is an EV charging site in Glasgow, Glasgow City, run by Allego BV. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.25/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 48 Victoria Road, G42 7AA
- **Area:** Glasgow, Glasgow City, United Kingdom
- **Coordinates (latitude, longitude):** 55.84182, -4.26311

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.25/kWh (from Open Charge Map)

## Site information

- **Operator:** Allego BV
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)
- **Notes:** Shell Recharge

## Common questions

### How much does it cost to charge at Shell St Andrews Cross (Allego BV)?

The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Shell St Andrews Cross (Allego BV)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Shell St Andrews Cross (Allego BV) have?

1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.

### Who operates Shell St Andrews Cross?

Shell St Andrews Cross is on the Allego BV network.

### How long does a Tesla Model Y Long Range take to charge at Shell St Andrews Cross (Allego BV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell St Andrews Cross (Allego BV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Shell St Andrews Cross (Allego BV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Glasgow](https://ampmap.co.uk/chargers/united-kingdom/glasgow-city/glasgow)
- [Allego BV chargers](https://ampmap.co.uk/networks/allego-bv)

## Chargers near this site

- [Kenmure Street (Albert Drive) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-kenmure-street-albert-drive-uk) - Type 2 22 kW, Type 2 7 kW · Albert Drive
- [Allison Street · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-allison-street-uk) - Type 2 7 kW · Allison Street
- [Arnold Clark Glasgow Kilburnie Street Vanstore · Arnold Clark Dealer Network](https://ampmap.co.uk/charger/arnold-clark-glasgow-kilburnie-street-vanstore-uk) - CCS 150 kW, CHAdeMO 50 kW · 149 Kilburnie Street
- [Victoria Road, Glasgow · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-victoria-road-glasgow-uk) - Type 2 22 kW · Victoria Road
- [Torrisdale Street, Glasgow · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-torrisdale-street-glasgow-uk) - Type 2 7 kW · Torrisdale Street
- [Albert Avenue · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-albert-avenue-uk) - Type 2 7 kW · Albert Avenue

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/allego-bv-shell-st-andrews-cross-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 18 Jan 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.