Allego BV · EV charging site
Stadium MK
Stadium Way, Bletchley, MK1 1ST
Stadium MK is an EV charging site in Bletchley, Milton Keynes, run by Allego BV. All 6 of its sockets are 350 kW CCS, and the price is listed as £0.85/kWh. 16 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EH - IKEA Milton Keynes (GRIDSERVE), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Allego BV
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.85/kWh(from Open Charge Map, 1 Jun 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Stadium MK (Allego BV)?
The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Stadium MK (Allego BV)?
Up to 350 kW DC via CCS.
How many charging sockets does Stadium MK (Allego BV) have?
6 charging sockets: 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS.
Who operates Stadium MK?
Stadium MK is on the Allego BV network.
Where is the nearest other charger with 50 kW or more to Stadium MK (Allego BV)?
EH - IKEA Milton Keynes (GRIDSERVE) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stadium MK (Allego BV)?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stadium MK (Allego BV)?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stadium MK (Allego BV)?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point MK1 Shopping Park
- Pod Point MK1 Leisure Park
- EH - IKEA Milton Keynes
- Pod Point Tesco Extra - Milton Keynes Bletchley
- Pod Point Glyn Hopkin Nissan Milton Keynes
- Milton Keynes, UK - Merton Drive
- Cheapest nearby
- Pod Point Glyn Hopkin Nissan Milton Keynes · Free · 7 kW · 0.6 mi