# Stadium MK · Allego BV

Web page: https://ampmap.co.uk/charger/allego-bv-stadium-mk-uk

Stadium MK is an EV charging site in Bletchley, Milton Keynes, run by Allego BV. All 6 of its sockets are 350 kW CCS, and the price is listed as £0.85/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Stadium Way, MK1 1ST
- **Area:** Bletchley, Milton Keynes, United Kingdom
- **Coordinates (latitude, longitude):** 52.00770, -0.73430

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 350 kW | 6 | Not listed |

- **Price:** £0.85/kWh (from Open Charge Map)

## Site information

- **Operator:** Allego BV
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Stadium MK (Allego BV)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Stadium MK (Allego BV)?

Up to 350 kW DC via CCS.

### How many charging sockets does Stadium MK (Allego BV) have?

6 charging sockets: 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS, 1 × 350 kW CCS.

### Who operates Stadium MK?

Stadium MK is on the Allego BV network.

### How long does a Tesla Model Y Long Range take to charge at Stadium MK (Allego BV)?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stadium MK (Allego BV)?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stadium MK (Allego BV)?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bletchley](https://ampmap.co.uk/chargers/united-kingdom/milton-keynes/bletchley)
- [Cheapest charging in Bletchley](https://ampmap.co.uk/chargers/united-kingdom/milton-keynes/bletchley/cheapest)
- [Allego BV chargers](https://ampmap.co.uk/networks/allego-bv)

## Chargers near this site

- [Pod Point MK1 Shopping Park](https://ampmap.co.uk/charger/pod-point-mk1-shopping-and-leisure-park-uk) - Type 2 7 kW · Stadium Way Milton Keynes · From 44.4p/kWh
- [Pod Point MK1 Leisure Park](https://ampmap.co.uk/charger/pod-point-mk1-leisure-park-2-uk) - Type 2 7 kW · Stadium Way Milton Keynes · From 44.4p/kWh
- [EH - IKEA Milton Keynes · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-ikea-milton-keynes-uk) - CCS 50 kW, CHAdeMO 50 kW · Goslington · From 85p/kWh
- [Pod Point Tesco Extra - Milton Keynes Bletchley](https://ampmap.co.uk/charger/pod-point-tesco-extra-milton-keynes-bletchley-2-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · Watling Street Bletchley · From 44.4p/kWh
- [Pod Point Glyn Hopkin Nissan Milton Keynes](https://ampmap.co.uk/charger/nissan-uk-dealer-network-glyn-hopkin-nissan-milton-keynes-uk) - Type 2 7 kW · Merton Drive Redmoor · Free to use
- [Milton Keynes, UK - Merton Drive · Tesla](https://ampmap.co.uk/charger/tesla-milton-keynes-uk-merton-drive-uk) - CCS 250 kW · Unit 3, Merton Drive · From 34p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/allego-bv-stadium-mk-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Jun 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
