EV charging site
Ancient Shepherds Public House
5 High Street, Cambridge, CB5 8ST
Ancient Shepherds Public House is an EV charging site in Cambridge, Cambridgeshire. Both of its sockets are 7 kW Type 2, and the price is listed as Free for pub customers. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Newmarket Road (InstaVolt Ltd), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- Free for pub customers(from Open Charge Map, 10 Jul 2019)
- Phone (from Open Charge Map)
- 01223 293280
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Ancient Shepherds Public House?
The listed price is Free for pub customers. Prices can change, so check the price at the charger before you start.
How fast is charging at Ancient Shepherds Public House?
Up to 7 kW AC via Type 2.
How many charging sockets does Ancient Shepherds Public House have?
2 charging sockets: 2 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to Ancient Shepherds Public House?
McDonald's Newmarket Road (InstaVolt Ltd) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ancient Shepherds Public House?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ancient Shepherds Public House?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ancient Shepherds Public House?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- McDonald's Newmarket Road
- Cambridge Sq Cambridge Sq 10
- Teversham SF Connect
- Cambridge Sq Cambridge Sq 12
- Cambridge Sq Cambridge Sq 3
- Golden Hind (Cambridge)
- Cheapest nearby
- Golden Hind (Cambridge) · 85p per kWh · 75 kW · 1.3 mi
- Fastest nearby
- Teversham SF Connect · 150 kW · 0.7 mi