Applegreen Fast Charge · EV charging site
Applegreen Electric Sarn Park
Sarn Park Services, Coity, CF32 9SY
Applegreen Electric Sarn Park is an EV charging site in Coity, Bridgend county borough, run by Applegreen Fast Charge. All 6 of its sockets are 180 kW CCS. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Sarn Park, UK (Tesla), 50 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Applegreen Fast Charge
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +353 1 512 4800
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Applegreen Electric Sarn Park (Applegreen Fast Charge)?
Up to 180 kW DC via CCS.
How many charging sockets does Applegreen Electric Sarn Park (Applegreen Fast Charge) have?
6 charging sockets: 2 × 180 kW CCS, 2 × 180 kW CCS, 2 × 180 kW CCS.
Who operates Applegreen Electric Sarn Park?
Applegreen Electric Sarn Park is on the Applegreen Fast Charge network. For site issues, the operator lists +353 1 512 4800.
Where is the nearest other charger with 50 kW or more to Applegreen Electric Sarn Park (Applegreen Fast Charge)?
Sarn Park, UK (Tesla) is 50 yards away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Applegreen Electric Sarn Park (Applegreen Fast Charge)?
A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Applegreen Electric Sarn Park (Applegreen Fast Charge)?
A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Applegreen Electric Sarn Park (Applegreen Fast Charge)?
A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Sarn Park, UK
- EH - Welcome Break Sarn Park
- Bridgend, UK
- Rawowned Bridgend 1
- Sarn Station Park & Ride 1
- Hope Street, Aberkenfig
- Cheapest nearby
- Sarn Park, UK · 56p per kWh · 250 kW · 50 yd
- Fastest nearby
- Sarn Park, UK · 250 kW · 50 yd