Applegreen Fast Charge · EV charging site
M1 Gateway Services
Springwood Crescent, Borehamwood, NW7 3HU
M1 Gateway Services is an EV charging site in Borehamwood, Hertfordshire, run by Applegreen Fast Charge. All 24 of its sockets are 150 kW CCS. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is London Gateway, UK (Tesla), 40 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Applegreen Fast Charge
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +353 1 512 4800
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at M1 Gateway Services (Applegreen Fast Charge)?
Up to 150 kW DC via CCS.
How many charging sockets does M1 Gateway Services (Applegreen Fast Charge) have?
24 charging sockets: 12 × 150 kW CCS.
Who operates M1 Gateway Services?
M1 Gateway Services is on the Applegreen Fast Charge network. For site issues, the operator lists +353 1 512 4800.
Where is the nearest other charger with 50 kW or more to M1 Gateway Services (Applegreen Fast Charge)?
London Gateway, UK (Tesla) is 40 yards away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at M1 Gateway Services (Applegreen Fast Charge)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at M1 Gateway Services (Applegreen Fast Charge)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at M1 Gateway Services (Applegreen Fast Charge)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- London Gateway, UK
- EH - Welcome Break London Gateway
- Shell Recharge Shell Mill Hill
- Shell Recharge Shell Stirling Corner
- Morrisons
- Atlantic House
- Cheapest nearby
- London Gateway, UK · 58p per kWh · 250 kW · 40 yd
- Fastest nearby
- Shell Recharge Shell Mill Hill · 400 kW · 0.6 mi