# Arnold Clarke · Arnold Clark Dealer Network

Web page: https://ampmap.co.uk/charger/arnold-clarke-uk

Arnold Clarke is an EV charging site in Doncaster, run by Arnold Clark Dealer Network. It has a single socket, with CCS at up to 150 kW, and the price is listed as £0.55/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Wheatley Hall Road, DN2 4GF
- **Area:** Doncaster, United Kingdom
- **Coordinates (latitude, longitude):** 53.54290, -1.10533

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 150 kW | 8 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |

- **Price:** £0.55/kWh (from Open Charge Map)

## Site information

- **Operator:** Arnold Clark Dealer Network
- **Opening hours:** Not published
- **Access:** Customers only

## Common questions

### How much does it cost to charge at Arnold Clarke (Arnold Clark Dealer Network)?

The listed price is £0.55/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Arnold Clarke (Arnold Clark Dealer Network)?

Up to 150 kW DC via CCS, CHAdeMO.

### How many charging sockets does Arnold Clarke (Arnold Clark Dealer Network) have?

1 charging socket: 8 × 150 kW CCS, 1 × 50 kW CHAdeMO.

### Who operates Arnold Clarke?

Arnold Clarke is on the Arnold Clark Dealer Network network. For site issues, the operator lists 01917434625.

### Can anyone charge at Arnold Clarke (Arnold Clark Dealer Network)?

The operator lists this charger for customers of the site.

### How long does a Tesla Model Y Long Range take to charge at Arnold Clarke (Arnold Clark Dealer Network)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Arnold Clarke (Arnold Clark Dealer Network)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Arnold Clarke (Arnold Clark Dealer Network)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Doncaster](https://ampmap.co.uk/chargers/united-kingdom/doncaster/doncaster)
- [Arnold Clark Dealer Network chargers](https://ampmap.co.uk/networks/arnold-clark-dealer-network)

## Chargers near this site

- [HU - Wheatley Doncaster · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-wheatley-hall-retail-park-uk) - CCS 180 kW, CHAdeMO 80 kW · Wheatley Centre Shopping Park · From 59p/kWh
- [Argo Drive · Zest Charging](https://ampmap.co.uk/charger/zest-charging-argo-drive-uk) - CCS 120 kW · Argo Drive
- [HU - Quest Park · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-quest-park-uk) - CCS 360 kW · Portland Court · From 85p/kWh
- [McDonalds · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-mcdonalds-uk) - CCS 120 kW, CHAdeMO 60 kW · Ogden Road
- [Wool Market Car Park, Doncaster 1 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-wool-market-car-park-doncaster-1-uk) - Type 2 22 kW · Church Way
- [Doncaster Market · RWE / Npower](https://ampmap.co.uk/charger/rwe-npower-doncaster-market-uk) - Type 2 22 kW · Church Way

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/arnold-clarke-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Apr 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
