# Ashdown Park Hotel

Web page: https://ampmap.co.uk/charger/ashdown-park-hotel-uk

Ashdown Park Hotel is an EV charging site in East Grinstead, West Sussex, run by Ashdown Park Hotel and open 24 hours a day. Both of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 100% uptime and recorded 38 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 16:26 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Ashdown Park Hotel, RH18 5JR
- **Area:** East Grinstead, West Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 51.07084, 0.04101
- **Getting there:** The Charge points are located near the main entrance.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** Ashdown Park Hotel
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Ashdown Park Hotel?

Up to 22 kW AC via Type 2.

### How many charging sockets does Ashdown Park Hotel have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Ashdown Park Hotel open 24/7?

Yes - Ashdown Park Hotel is open 24 hours a day, 7 days a week.

### When is Ashdown Park Hotel busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Ashdown Park Hotel?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 38 observed charging sessions.

### Who operates Ashdown Park Hotel?

Ashdown Park Hotel is on the Ashdown Park Hotel network.

### How long does a Tesla Model Y Long Range take to charge at Ashdown Park Hotel?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ashdown Park Hotel?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Ashdown Park Hotel?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in East Grinstead](https://ampmap.co.uk/chargers/united-kingdom/west-sussex/east-grinstead)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ashdown-park-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Ashdown Park Hotel (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
