Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Animal Trust Birkenhead

Conway Street, Birkenhead, CH41 4AH

Animal Trust Birkenhead is an EV charging site in Birkenhead, Metropolitan Borough of Wirral, run by Be.EV. Its 3 sockets reach up to 51 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.59 to £0.84 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 96% uptime and recorded 107 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Woodchurch Road (Roam Charging), 0.7 miles away.

Status

3 of 3 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 51 kW1 connector · 84p per kWh1 free
BEEVR0011-199% reliabilityAvailable
CHAdeMO · 51 kW1 connector · 84p per kWh1 free
BEEVR0011-289% reliabilityAvailable
Type 2 · 22 kW1 connector · 59p per kWh1 free
BEEVR0011-3100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Tue–Thu 08:30–18:30Sat 08:30–18:30No charging outside opening hours
Parking
Car park
Payment
Contactless card at the chargerIn the Be.EV appRFID card
Charger ID
BEEVR0011-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS51 kW84p per kWh
CHAdeMO51 kW84p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 51 kW CCS~68 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 51 kW CCS~50 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 51 kW CCS~65 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 51 kW CCS~63 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 51 kW CCS~54 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 51 kW CCS~54 min · ≈ 41 kWh · ~£34
Nissan LEAF 10–80% · 51 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Animal Trust Birkenhead (Be.EV)?

The listed price is CCS £0.84/kWh · CHAdeMO £0.84/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Animal Trust Birkenhead (Be.EV)?

Up to 51 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Animal Trust Birkenhead (Be.EV) have?

3 charging sockets: 1 × 51 kW CCS, 1 × 51 kW CHAdeMO, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Animal Trust Birkenhead (Be.EV) open?

Opening hours: Tue–Thu 08:30–18:30; Sat 08:30–18:30.

When is Animal Trust Birkenhead (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Animal Trust Birkenhead (Be.EV)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 107 observed charging sessions.

Who operates Animal Trust Birkenhead?

Animal Trust Birkenhead is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Animal Trust Birkenhead (Be.EV)?

Woodchurch Road (Roam Charging) is 0.7 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Animal Trust Birkenhead (Be.EV)?

A typical 10–80% rapid charge takes about 68 min on the 51 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Animal Trust Birkenhead (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 51 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Animal Trust Birkenhead (Be.EV)?

A typical 10–80% rapid charge takes about 65 min on the 51 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.