Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Blue Diamond Newbridge Nurseries

Billingshurst Road, Horsham, RH12 3LN

Blue Diamond Newbridge Nurseries is an EV charging site in Horsham, West Sussex, run by Be.EV. Its 8 sockets reach up to 150 kW, with CCS at the top speed, and published prices run from £0.84 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 415 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Horsham, 0.9 miles away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW6 connectors · 89p per kWh6 free
KM0091-03100% reliabilityAvailable
KM0091-04100% reliabilityAvailable
KM0091-05100% reliabilityAvailable
KM0091-06100% reliabilityAvailable
KM0091-07100% reliabilityAvailable
KM0091-08100% reliabilityAvailable
CCS · 100 kW1 connector · 89p per kWh1 free
KM0091-02100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 84p per kWh1 free
KM0091-01100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Mon–Sat 08:30–17:30Sun 10:00–16:30No charging outside opening hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
KM0091-01

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW89p per kWh
CCS100 kW89p per kWh
CHAdeMO50 kW84p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Blue Diamond Newbridge Nurseries (Be.EV)?

The listed price is CCS £0.89/kWh · CHAdeMO £0.84/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Blue Diamond Newbridge Nurseries (Be.EV)?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Blue Diamond Newbridge Nurseries (Be.EV) have?

8 charging sockets: 6 × 150 kW CCS, 1 × 50 kW CHAdeMO, 1 × 100 kW CCS. Live per-socket availability is shown on this page.

When is Blue Diamond Newbridge Nurseries (Be.EV) open?

Opening hours: Mon–Sat 08:30–17:30; Sun 10:00–16:30.

When is Blue Diamond Newbridge Nurseries (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Blue Diamond Newbridge Nurseries (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 415 observed charging sessions.

Who operates Blue Diamond Newbridge Nurseries?

Blue Diamond Newbridge Nurseries is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Blue Diamond Newbridge Nurseries (Be.EV)?

Shell Recharge Shell Horsham is 0.9 miles away in a straight line, with up to 300 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Blue Diamond Newbridge Nurseries (Be.EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Blue Diamond Newbridge Nurseries (Be.EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Blue Diamond Newbridge Nurseries (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.