Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Booth Street West MSCP

Booth Street West MSCP, Manchester, M15 6PB

Booth Street West MSCP is an EV charging site in Manchester, run by Be.EV and open 24 hours a day. All 4 of its sockets are 3 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 146 charging sessions here over the last 30 days. 20 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MMU Birley Fields (Be.EV), 0.4 miles away.

Status

3 of 4 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 3 kW4 connectors · 59p per kWh3 free1 in use
BVFGM0083-A100% reliabilityAvailable
BVFGM0083-B100% reliabilityAvailable
BVFGM0084-A100% reliabilityAvailable
BVFGM0084-B100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Mon–Sun 06:00–23:45No charging outside opening hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVFGM0083-A

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 23 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 3 kW Type 2~18h 26m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 3 kW Type 2~13h 18m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 3 kW Type 2~17h 2m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 3 kW Type 2~16h 56m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 3 kW Type 2~14h 14m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 3 kW Type 2~13h 32m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 3 kW Type 2~9h 20m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Booth Street West MSCP (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Booth Street West MSCP (Be.EV)?

Up to 3 kW AC via Type 2.

How many charging sockets does Booth Street West MSCP (Be.EV) have?

4 charging sockets: 4 × 3 kW Type 2. Live per-socket availability is shown on this page.

Is Booth Street West MSCP (Be.EV) open 24/7?

Yes - Booth Street West MSCP (Be.EV) is open 24 hours a day, 7 days a week.

When is Booth Street West MSCP (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 7 pm. The live status on this page shows what is free before you set off.

How reliable is Booth Street West MSCP (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 146 observed charging sessions.

Who operates Booth Street West MSCP?

Booth Street West MSCP is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Booth Street West MSCP (Be.EV)?

MMU Birley Fields (Be.EV) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Booth Street West MSCP (Be.EV)?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Booth Street West MSCP (Be.EV)?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Booth Street West MSCP (Be.EV)?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.