Be.EV · EV charging site
Brandy Row
Brandy Row, Weymouth, DT5 1AR
Brandy Row is an EV charging site in Weymouth, Dorset, run by Be.EV and open 24 hours a day. All 4 of its sockets are 22 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 6 am, and Amp Map measured 73% uptime and recorded 6 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Masonic Car Park (Be.EV), 0.3 miles away.
Status
3 of 4 available
Checking status…
Connectors
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Be.EV
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- In the Be.EV app
- Charger ID
- AD01095-1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 22 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Brandy Row (Be.EV)?
The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Brandy Row (Be.EV)?
Up to 22 kW AC via Type 2.
How many charging sockets does Brandy Row (Be.EV) have?
4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Brandy Row (Be.EV) open 24/7?
Yes - Brandy Row (Be.EV) is open 24 hours a day, 7 days a week.
When is Brandy Row (Be.EV) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around 3 pm. The live status on this page shows what is free before you set off.
How reliable is Brandy Row (Be.EV)?
Amp Map measured 73% uptime here from recorded live status over the last 30 days, across 6 observed charging sessions.
Who operates Brandy Row?
Brandy Row is on the Be.EV network.
Where is the nearest charger with 50 kW or more to Brandy Row (Be.EV)?
Masonic Car Park (Be.EV) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Brandy Row (Be.EV)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brandy Row (Be.EV)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Brandy Row (Be.EV)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Masonic Car Park
- The Heights Hotel
- Osprey Quay Service Station
- Lidl Portland
- Grange Croft Car Park
- Pod Point Tesco Superstore - Portland Easton
- Cheapest nearby
- Pod Point Tesco Superstore - Portland Easton · 44.4p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- Masonic Car Park · 50 kW · 0.3 mi