Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Fern Barrow Car Park

Fern Barrow, Bournemouth, BH12 5BB

Fern Barrow Car Park is an EV charging site in Bournemouth, Bournemouth, Christchurch and Poole Council, run by Be.EV and open 24 hours a day. Both of its sockets are 75 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 49 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bournemouth University (MER), 10 yards away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW2 connectors · 89p per kWh2 free
RTM0067-1100% reliabilityAvailable
RTM0067-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
RTM0067-1

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Fern Barrow Car Park (Be.EV)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Fern Barrow Car Park (Be.EV)?

Up to 75 kW DC via CCS.

How many charging sockets does Fern Barrow Car Park (Be.EV) have?

2 charging sockets: 2 × 75 kW CCS. Live per-socket availability is shown on this page.

Is Fern Barrow Car Park (Be.EV) open 24/7?

Yes - Fern Barrow Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Fern Barrow Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Fern Barrow Car Park (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 49 observed charging sessions.

Who operates Fern Barrow Car Park?

Fern Barrow Car Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Fern Barrow Car Park (Be.EV)?

Bournemouth University (MER) is 10 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Fern Barrow Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fern Barrow Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Fern Barrow Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.