Be.EV · EV charging site
UoS - Allerton Car Park
Frederick Road Car Park - Frederick Road, Salford, M6 6NY
UoS - Allerton Car Park is an EV charging site in Salford, City and Borough of Salford, run by Be.EV and open 24 hours a day. Both of its sockets are 7 kW Type 2, and the published price is £0.59 per kWh. Amp Map measured 100% uptime here over the last 30 days. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is A6 Crescent House Lay-by (Be.EV), 0.6 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Be.EV
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- In the Be.EV appRFID card
- Charger ID
- BVFGM0050-A
- Owner
- TfGM
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at UoS - Allerton Car Park (Be.EV)?
The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at UoS - Allerton Car Park (Be.EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does UoS - Allerton Car Park (Be.EV) have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is UoS - Allerton Car Park (Be.EV) open 24/7?
Yes - UoS - Allerton Car Park (Be.EV) is open 24 hours a day, 7 days a week.
How reliable is UoS - Allerton Car Park (Be.EV)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates UoS - Allerton Car Park?
UoS - Allerton Car Park is on the Be.EV network.
Where is the nearest charger with 50 kW or more to UoS - Allerton Car Park (Be.EV)?
A6 Crescent House Lay-by (Be.EV) is 0.6 miles away in a straight line, with up to 51 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at UoS - Allerton Car Park (Be.EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at UoS - Allerton Car Park (Be.EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at UoS - Allerton Car Park (Be.EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Allerton Car Park
- Pendleton Town Centre
- Cockcroft Road
- Pod Point Tesco Extra - Salford
- A6 Crescent House Lay-by
- Texaco Cromwell Road
- Cheapest nearby
- Pod Point Tesco Extra - Salford · 49.2p per kWh · 22 kW · 0.4 mi
- Fastest nearby
- A6 Crescent House Lay-by · 51 kW · 0.6 mi