# Herring Lane Car Park · Be.EV

Web page: https://ampmap.co.uk/charger/be-ev-herring-lane-car-park-uk

Herring Lane Car Park is an EV charging site in Spalding, Lincolnshire, run by Be.EV and open 24 hours a day. Both of its sockets are 60 kW CCS, and the published price is £0.84 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 99% uptime and recorded 141 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 19:56 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Herring Lane, PE11 1TL
- **Area:** Spalding, Lincolnshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.78720, -0.14980
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 60 kW | 2 | £0.84/kWh | 2 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Be.EV
- **Opening hours:** Open 24 hours
- **Payment:** In the Be.EV app

## Common questions

### How much does it cost to charge at Herring Lane Car Park (Be.EV)?

The listed price is £0.84/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Herring Lane Car Park (Be.EV)?

Up to 60 kW DC via CCS.

### How many charging sockets does Herring Lane Car Park (Be.EV) have?

2 charging sockets: 2 × 60 kW CCS. Live per-socket availability is shown on this page.

### Is Herring Lane Car Park (Be.EV) open 24/7?

Yes - Herring Lane Car Park (Be.EV) is open 24 hours a day, 7 days a week.

### When is Herring Lane Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Herring Lane Car Park (Be.EV)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 141 observed charging sessions.

### Who operates Herring Lane Car Park?

Herring Lane Car Park is on the Be.EV network.

### How long does a Tesla Model Y Long Range take to charge at Herring Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Herring Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Herring Lane Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Spalding](https://ampmap.co.uk/chargers/united-kingdom/lincolnshire/spalding)
- [Cheapest charging in Spalding](https://ampmap.co.uk/chargers/united-kingdom/lincolnshire/spalding/cheapest)
- [Be.EV chargers](https://ampmap.co.uk/networks/be-ev)

## Chargers near this site

- [Vine Street · Be.EV](https://ampmap.co.uk/charger/be-ev-vine-street-uk) - Type 2 7 kW · Vine Street · From 64p/kWh
- [Holland Rd Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-holland-road-car-park-spalding-uk) - Type 2 7 kW · Holland Rd Car Park · From 65p/kWh
- [Priory Road · Be.EV](https://ampmap.co.uk/charger/be-ev-priory-road-uk) - Type 2 22 kW · Priory Road · From 64p/kWh
- [South Holland District Council Priory Road · Incharge (SE)](https://ampmap.co.uk/charger/incharge-south-holland-district-council-priory-road-uk) - Type 2 22 kW · South Holland District Council Priory Road
- [Victoria Street · Be.EV](https://ampmap.co.uk/charger/incharge-victoria-street-car-park-victoria-street-uk) - Type 2 7 kW · Victoria Steet · From 64p/kWh
- [Spalding Retail Park · Be.EV](https://ampmap.co.uk/charger/be-ev-spalding-retail-park-uk) - CCS 300 kW, CCS 75 kW · Spalding Retail Parks Holland Markets · From 77p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/be-ev-herring-lane-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Be.EV (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
