Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Mill Gate Shopping Centre

Miden Parade, Bury, BL9 0QQ

Mill Gate Shopping Centre is an EV charging site in Bury, Borough of Bury, run by Be.EV. Its 3 sockets reach up to 51 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.59 to £0.77 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 98% uptime and recorded 54 charging sessions here over the last 30 days. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Rock Multi-storey Car Park Bury (Be.EV), 0.2 miles away.

Status

1 of 3 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 51 kW1 connector · 77p per kWh1 in use
BVRGM0004-1100% reliabilityCharging
CHAdeMO · 51 kW1 connector · 77p per kWh1 free
BVRGM0004-295% reliabilityAvailable
Type 2 · 22 kW1 connector · 59p per kWh1 in use
BVRGM0004-3100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Mon–Sat 08:00–18:30Sun 10:00–18:00No charging outside opening hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVRGM0004-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS51 kW77p per kWh
CHAdeMO51 kW77p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 51 kW CCS~68 min · ≈ 55 kWh · ~£43
Tesla Model 3 Rear-Wheel Drive 10–80% · 51 kW CCS~50 min · ≈ 40 kWh · ~£31
Audi Q4 e-tron 50 10–80% · 51 kW CCS~65 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 51 kW CCS~63 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 51 kW CCS~54 min · ≈ 43 kWh · ~£33
Hyundai Kona Electric Long Range 10–80% · 51 kW CCS~54 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 51 kW CHAdeMO~54 min · ≈ 28 kWh · ~£22

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Mill Gate Shopping Centre (Be.EV)?

The listed price is CCS £0.77/kWh · CHAdeMO £0.77/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Mill Gate Shopping Centre (Be.EV)?

Up to 51 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Mill Gate Shopping Centre (Be.EV) have?

3 charging sockets: 1 × 51 kW CCS, 1 × 51 kW CHAdeMO, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Mill Gate Shopping Centre (Be.EV) open?

Opening hours: Mon–Sat 08:00–18:30; Sun 10:00–18:00.

When is Mill Gate Shopping Centre (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Mill Gate Shopping Centre (Be.EV)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 54 observed charging sessions.

Who operates Mill Gate Shopping Centre?

Mill Gate Shopping Centre is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Mill Gate Shopping Centre (Be.EV)?

The Rock Multi-storey Car Park Bury (Be.EV) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Mill Gate Shopping Centre (Be.EV)?

A typical 10–80% rapid charge takes about 68 min on the 51 kW CCS here, adding roughly 55 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mill Gate Shopping Centre (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 51 kW CCS here, adding roughly 40 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Mill Gate Shopping Centre (Be.EV)?

A typical 10–80% rapid charge takes about 65 min on the 51 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.