Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Riverside Car Park

Riverside Car Park, Chester-le-Street, DH3 3SJ

Riverside Car Park is an EV charging site in Chester-le-Street, County Durham (DH3 3SJ), run by Be.EV and open 24 hours a day. All 4 of its sockets are 7 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 97% uptime and recorded 24 charging sessions here over the last 30 days. Amp Map lists 1 other charge point named Riverside Car Park in Chester-le-Street. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Osborne Road Car Park (Be.EV), 0.5 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW4 connectors · 59p per kWh4 free
AD00041-198% reliabilityAvailable
AD00041-299% reliabilityAvailable
AD00047-194% reliabilityAvailable
AD00047-295% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00041-1

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Riverside Car Park (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Riverside Car Park (Be.EV)?

Up to 7 kW AC via Type 2.

How many charging sockets does Riverside Car Park (Be.EV) have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Riverside Car Park (Be.EV) open 24/7?

Yes - Riverside Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Riverside Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 8 pm. The live status on this page shows what is free before you set off.

How reliable is Riverside Car Park (Be.EV)?

Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 24 observed charging sessions.

Who operates Riverside Car Park?

Riverside Car Park is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Riverside Car Park (Be.EV)?

Osborne Road Car Park (Be.EV) is 0.5 miles away in a straight line, with up to 60 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Riverside Car Park (Be.EV)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Riverside Car Park (Be.EV)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Riverside Car Park (Be.EV)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.