Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Rossmore Leisure Centre

Rossmore Leisure Centre, Bournemouth, BH12 4HR

Rossmore Leisure Centre is an EV charging site in Bournemouth, Bournemouth, Christchurch and Poole Council, run by Be.EV and open 24 hours a day. Its 6 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.59 to £0.84 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 216 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Westover Nissan (Nissan UK Dealer Network), 0.8 miles away.

Status

5 of 6 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW4 connectors · 84p per kWh3 free1 in use
ALW0040-1100% reliabilityAvailable
ALW0040-2100% reliabilityAvailable
ALW0041-1100% reliabilityAvailable
ALW0041-2100% reliabilityCharging
Type 2 · 22 kW2 connectors · 59p per kWh2 free
AD01067-1100% reliabilityAvailable
AD01067-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD01067-1

Facilities

Leisure

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW84p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£34
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Rossmore Leisure Centre (Be.EV)?

The listed price is CCS £0.84/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Rossmore Leisure Centre (Be.EV)?

Up to 50 kW DC via CCS, Type 2.

How many charging sockets does Rossmore Leisure Centre (Be.EV) have?

6 charging sockets: 4 × 50 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Rossmore Leisure Centre (Be.EV) open 24/7?

Yes - Rossmore Leisure Centre (Be.EV) is open 24 hours a day, 7 days a week.

When is Rossmore Leisure Centre (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Rossmore Leisure Centre (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 216 observed charging sessions.

Who operates Rossmore Leisure Centre?

Rossmore Leisure Centre is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Rossmore Leisure Centre (Be.EV)?

Westover Nissan (Nissan UK Dealer Network) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Rossmore Leisure Centre (Be.EV)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rossmore Leisure Centre (Be.EV)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Rossmore Leisure Centre (Be.EV)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.