Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Spennymoor Leisure Centre Car Park

Cambridge Street, Spennymoor, DL16 6DF

Spennymoor Leisure Centre Car Park is an EV charging site in Spennymoor, County Durham, run by Be.EV and open 24 hours a day. Its 4 sockets reach up to 60 kW, with CCS at the top speed, and the published price is £0.84 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 47% uptime and recorded 137 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Durham, UK (Tesla), 3.5 miles away.

Status

2 of 4 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 60 kW2 connectors · 84p per kWh1 free1 out of service
PA0002-1100% reliabilityAvailable
PA0004-10% reliabilityOut of order
CHAdeMO · 50 kW2 connectors · 84p per kWh1 free1 out of service
PA0002-2100% reliabilityAvailable
PA0004-20% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
PA0002-1

Facilities

Car parkLeisure

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS60 kW84p per kWh
CHAdeMO50 kW84p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 60 kW CCS~58 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 60 kW CCS~43 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 60 kW CCS~57 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 60 kW CCS~53 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 60 kW CCS~47 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 60 kW CCS~49 min · ≈ 41 kWh · ~£34
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Spennymoor Leisure Centre Car Park (Be.EV)?

The listed price is £0.84/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Spennymoor Leisure Centre Car Park (Be.EV)?

Up to 60 kW DC via CHAdeMO, CCS.

How many charging sockets does Spennymoor Leisure Centre Car Park (Be.EV) have?

4 charging sockets: 2 × 50 kW CHAdeMO, 2 × 60 kW CCS. Live per-socket availability is shown on this page.

Is Spennymoor Leisure Centre Car Park (Be.EV) open 24/7?

Yes - Spennymoor Leisure Centre Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Spennymoor Leisure Centre Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Spennymoor Leisure Centre Car Park (Be.EV)?

Amp Map measured 47% uptime here from recorded live status over the last 30 days, across 137 observed charging sessions.

Who operates Spennymoor Leisure Centre Car Park?

Spennymoor Leisure Centre Car Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Spennymoor Leisure Centre Car Park (Be.EV)?

Durham, UK (Tesla) is 3.5 miles away in a straight line, with up to 250 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Spennymoor Leisure Centre Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Spennymoor Leisure Centre Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Spennymoor Leisure Centre Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.