# Top o'Town Car Park · Be.EV

Web page: https://ampmap.co.uk/charger/be-ev-top-o-town-car-park-uk

Top o'Town Car Park is an EV charging site in Dorchester, Dorset, run by Be.EV and open 24 hours a day. Its 3 sockets reach up to 150 kW, with CCS at the top speed, and published prices run from £0.84 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 92% uptime and recorded 500 charging sessions here over the last 30 days.

## Status

3 of 3 open at 22 Nov 2026, 20:35 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Top o'Town Car Park, DT1 1XT
- **Area:** Dorchester, Dorset, United Kingdom
- **Coordinates (latitude, longitude):** 50.71490, -2.44320
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | £0.89/kWh | 2 free |
| CHAdeMO | 50 kW | 1 | £0.84/kWh | 1 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Be.EV
- **Opening hours:** Open 24 hours
- **Payment:** In the Be.EV app

## Common questions

### How much does it cost to charge at Top o'Town Car Park (Be.EV)?

The listed price is CCS £0.89/kWh · CHAdeMO £0.84/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Top o'Town Car Park (Be.EV)?

Up to 150 kW DC via CCS, CHAdeMO.

### How many charging sockets does Top o'Town Car Park (Be.EV) have?

3 charging sockets: 2 × 150 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

### Is Top o'Town Car Park (Be.EV) open 24/7?

Yes - Top o'Town Car Park (Be.EV) is open 24 hours a day, 7 days a week.

### When is Top o'Town Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is Top o'Town Car Park (Be.EV)?

Amp Map measured 92% uptime here from recorded live status over the last 30 days, across 500 observed charging sessions.

### Who operates Top o'Town Car Park?

Top o'Town Car Park is on the Be.EV network.

### How long does a Tesla Model Y Long Range take to charge at Top o'Town Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Top o'Town Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Top o'Town Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Dorchester](https://ampmap.co.uk/chargers/united-kingdom/dorset/dorchester)
- [Cheapest charging in Dorchester](https://ampmap.co.uk/chargers/united-kingdom/dorset/dorchester/cheapest)
- [Be.EV chargers](https://ampmap.co.uk/networks/be-ev)

## Chargers near this site

- [County Hall Car Park · Be.EV](https://ampmap.co.uk/charger/be-ev-county-hall-car-park-uk) - Type 2 22 kW · County Hall · From 59p/kWh
- [The Colliton Park car park · Be.EV](https://ampmap.co.uk/charger/be-ev-the-colliton-park-car-park-uk) - CCS 50 kW, Type 2 22 kW · Colliton Park · From 59p/kWh
- [Lower Trinity Street Car Park · Be.EV](https://ampmap.co.uk/charger/mer-dorchester-trinity-street-car-park-uk) - CCS 150 kW, CHAdeMO 50 kW · Lower Trinity Street Car Park · From 84p/kWh
- [Fairfield Car Park · Be.EV](https://ampmap.co.uk/charger/be-ev-fairfield-car-park-uk) - CCS 150 kW, CHAdeMO 50 kW · Fairfield Car Park · From 59p/kWh
- [Wollaston Field Car Park · Be.EV](https://ampmap.co.uk/charger/be-ev-wollaston-field-car-park-uk) - CCS 60 kW, Type 2 22 kW · Wollaston Field Car Park · From 59p/kWh
- [Brewhouse & Kitchen, Dorchester · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-brewhouse-and-kitchen-uk) - CCS 60 kW, CHAdeMO 50 kW · 27 Weymouth Avenue · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/be-ev-top-o-town-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Be.EV (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
