Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Trafford Town Hall - Warwick Road

Warwick Road, Old Trafford, M32 0TH

Trafford Town Hall - Warwick Road is an EV charging site in Old Trafford, Trafford, run by Be.EV and open Mon–Fri 09:00–17:00. Both of its sockets are 3 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 9 charging sessions here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Trafford Town Hall Car Park (Be.EV), 20 yards away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 3 kW2 connectors · 59p per kWh2 free
BVFGM0080-A100% reliabilityAvailable
BVFGM0080-B100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Mon–Fri 09:00–17:00No charging outside opening hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVFGM0080-A

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 23 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 3 kW Type 2~18h 26m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 3 kW Type 2~13h 18m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 3 kW Type 2~17h 2m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 3 kW Type 2~16h 56m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 3 kW Type 2~14h 14m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 3 kW Type 2~13h 32m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 3 kW Type 2~9h 20m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Trafford Town Hall - Warwick Road (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Trafford Town Hall - Warwick Road (Be.EV)?

Up to 3 kW AC via Type 2.

How many charging sockets does Trafford Town Hall - Warwick Road (Be.EV) have?

2 charging sockets: 2 × 3 kW Type 2. Live per-socket availability is shown on this page.

When is Trafford Town Hall - Warwick Road (Be.EV) open?

Opening hours: Mon–Fri 09:00–17:00.

When is Trafford Town Hall - Warwick Road (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Trafford Town Hall - Warwick Road (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 9 observed charging sessions.

Who operates Trafford Town Hall - Warwick Road?

Trafford Town Hall - Warwick Road is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Trafford Town Hall - Warwick Road (Be.EV)?

Trafford Town Hall Car Park (Be.EV) is 20 yards away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Trafford Town Hall - Warwick Road (Be.EV)?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trafford Town Hall - Warwick Road (Be.EV)?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Trafford Town Hall - Warwick Road (Be.EV)?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.