Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Two Riversmeet Leisure Centre

Stony Lane S, Christchurch, BH23 1HW

Two Riversmeet Leisure Centre is an EV charging site in Christchurch, Bournemouth, Christchurch and Poole Council, run by Be.EV and open 24 hours a day. Its 4 sockets reach up to 100 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 48% uptime and recorded 46 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Saxon Square Multi-Storey Car Park (Be.EV), 0.4 miles away.

Status

2 of 4 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 100 kW2 connectors · 89p per kWhOut of service
KM0051-010% reliabilityOut of order
KM0051-020% reliabilityOut of order
Type 2 · 22 kW2 connectors · 59p per kWh2 free
AD01040-1100% reliabilityAvailable
AD01040-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD01040-1

Facilities

Leisure

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS100 kW89p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 100 kW CCS~36 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 100 kW CCS~29 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 100 kW CCS~43 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 100 kW CCS~32 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 100 kW CCS~34 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 100 kW CCS~40 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Two Riversmeet Leisure Centre (Be.EV)?

The listed price is Type 2 £0.59/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Two Riversmeet Leisure Centre (Be.EV)?

Up to 100 kW DC via Type 2, CCS.

How many charging sockets does Two Riversmeet Leisure Centre (Be.EV) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 100 kW CCS. Live per-socket availability is shown on this page.

Is Two Riversmeet Leisure Centre (Be.EV) open 24/7?

Yes - Two Riversmeet Leisure Centre (Be.EV) is open 24 hours a day, 7 days a week.

When is Two Riversmeet Leisure Centre (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Two Riversmeet Leisure Centre (Be.EV)?

Amp Map measured 48% uptime here from recorded live status over the last 30 days, across 46 observed charging sessions.

Who operates Two Riversmeet Leisure Centre?

Two Riversmeet Leisure Centre is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Two Riversmeet Leisure Centre (Be.EV)?

Saxon Square Multi-Storey Car Park (Be.EV) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Two Riversmeet Leisure Centre (Be.EV)?

A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Two Riversmeet Leisure Centre (Be.EV)?

A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Two Riversmeet Leisure Centre (Be.EV)?

A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.