Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Waverley Queen Street Car Park

Queen Street, Godalming, GU7 1BA

Waverley Queen Street Car Park is an EV charging site in Godalming, Surrey, run by Be.EV and open 24 hours a day. Both of its sockets are 22 kW Type 2, and the published price is £0.64 per kWh. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 0% uptime here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Godalming Crown Court Car Park (GeniePoint), 0.2 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW2 connectors · 64p per kWhOut of service
AD00280-10% reliabilityOut of order
AD00280-20% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00280-1

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW64p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£35
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£27
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Waverley Queen Street Car Park (Be.EV)?

The listed price is £0.64/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Waverley Queen Street Car Park (Be.EV)?

Up to 22 kW AC via Type 2.

How many charging sockets does Waverley Queen Street Car Park (Be.EV) have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Waverley Queen Street Car Park (Be.EV) open 24/7?

Yes - Waverley Queen Street Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Waverley Queen Street Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 2 pm. The live status on this page shows what is free before you set off.

How reliable is Waverley Queen Street Car Park (Be.EV)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Waverley Queen Street Car Park?

Waverley Queen Street Car Park is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Waverley Queen Street Car Park (Be.EV)?

Godalming Crown Court Car Park (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Waverley Queen Street Car Park (Be.EV)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Waverley Queen Street Car Park (Be.EV)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Waverley Queen Street Car Park (Be.EV)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.