Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Wollaston Field Car Park

Wollaston Field Car Park, Dorchester, DT1 1EQ

Wollaston Field Car Park is an EV charging site in Dorchester, Dorset, run by Be.EV and open 24 hours a day. Its 6 sockets reach up to 60 kW, with CCS at the top speed, and published prices run from £0.59 to £0.84 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 91% uptime and recorded 203 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Lower Trinity Street Car Park (Be.EV), 0.2 miles away.

Status

4 of 6 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 60 kW4 connectors · 84p per kWh2 free2 out of service
PA0008-165% reliabilityOut of order
PA0008-265% reliabilityOut of order
PA0037-1100% reliabilityAvailable
PA0037-2100% reliabilityAvailable
Type 2 · 22 kW2 connectors · 59p per kWh2 free
AD00111-1100% reliabilityAvailable
AD00111-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
PA0008-1

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS60 kW84p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 60 kW CCS~58 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 60 kW CCS~43 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 60 kW CCS~57 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 60 kW CCS~53 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 60 kW CCS~47 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 60 kW CCS~49 min · ≈ 41 kWh · ~£34
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Wollaston Field Car Park (Be.EV)?

The listed price is Type 2 £0.59/kWh · CCS £0.84/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Wollaston Field Car Park (Be.EV)?

Up to 60 kW DC via Type 2, CCS.

How many charging sockets does Wollaston Field Car Park (Be.EV) have?

6 charging sockets: 2 × 22 kW Type 2, 4 × 60 kW CCS. Live per-socket availability is shown on this page.

Is Wollaston Field Car Park (Be.EV) open 24/7?

Yes - Wollaston Field Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Wollaston Field Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is Wollaston Field Car Park (Be.EV)?

Amp Map measured 91% uptime here from recorded live status over the last 30 days, across 203 observed charging sessions.

Who operates Wollaston Field Car Park?

Wollaston Field Car Park is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Wollaston Field Car Park (Be.EV)?

Lower Trinity Street Car Park (Be.EV) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Wollaston Field Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wollaston Field Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Wollaston Field Car Park (Be.EV)?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.