# Beacon Hill Farm

Web page: https://ampmap.co.uk/charger/beacon-hill-farm-uk

Beacon Hill Farm is an EV charging site in Ashington, Northumberland, run by Beacon Hill Farm and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 9 pm, and Amp Map measured 100% uptime and recorded 7 charging sessions here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 15:49 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Beacon Hill Farm Holidays, NE65 8QW
- **Area:** Ashington, Northumberland, United Kingdom
- **Coordinates (latitude, longitude):** 55.21670, -1.77331

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Beacon Hill Farm
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Beacon Hill Farm?

Up to 7 kW AC via Type 2.

### How many charging sockets does Beacon Hill Farm have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Beacon Hill Farm open 24/7?

Yes - Beacon Hill Farm is open 24 hours a day, 7 days a week.

### When is Beacon Hill Farm busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 pm and quietest around 1 pm. The live status on this page shows what is free before you set off.

### How reliable is Beacon Hill Farm?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 7 observed charging sessions.

### Who operates Beacon Hill Farm?

Beacon Hill Farm is on the Beacon Hill Farm network.

### How long does a Tesla Model Y Long Range take to charge at Beacon Hill Farm?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Beacon Hill Farm?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Beacon Hill Farm?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ashington](https://ampmap.co.uk/chargers/united-kingdom/northumberland/ashington)

## Chargers near this site

- [EVC Macdonald Linden Hall Hotel · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-macdonald-linden-hall-hotel-uk) - Type 2 7 kW · Longhorsley
- [Grandstand Services · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-grandstand-services-uk) - CCS 50 kW, CHAdeMO 50 kW · Fairmoor

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/beacon-hill-farm-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Beacon Hill Farm (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
