# Beko

Web page: https://ampmap.co.uk/charger/beko-2-uk

Beko is an EV charging site in Peterborough, run by Beko and open 24 hours a day. Its 39 sockets reach up to 22 kW, with Type 2 at the top speed. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 91% uptime and recorded 555 charging sessions here over the last 30 days.

## Status

32 of 39 open at 22 Nov 2026, 14:26 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Morley Way, PE2
- **Area:** Peterborough, United Kingdom
- **Coordinates (latitude, longitude):** 52.55394, -0.26189
- **Parking:** Car park

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 12 | Not listed | 12 free |
| Type 2 | 7 kW | 27 | Not listed | 20 free, 3 out of service, 4 status unknown |

## Site information

- **Operator:** Beko
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Beko?

Up to 22 kW AC via Type 2.

### How many charging sockets does Beko have?

39 charging sockets: 27 × 7 kW Type 2, 12 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Beko open 24/7?

Yes - Beko is open 24 hours a day, 7 days a week.

### When is Beko busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 7 pm. The live status on this page shows what is free before you set off.

### How reliable is Beko?

Amp Map measured 91% uptime here from recorded live status over the last 30 days, across 555 observed charging sessions.

### Who operates Beko?

Beko is on the Beko network.

### How long does a Tesla Model Y Long Range take to charge at Beko?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Beko?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Beko?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Peterborough](https://ampmap.co.uk/chargers/united-kingdom/peterborough/peterborough)
- [Cheapest charging in Peterborough](https://ampmap.co.uk/chargers/united-kingdom/peterborough/peterborough/cheapest)

## Chargers near this site

- [BP Woodston · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-bp-woodston-uk) - CHAdeMO 50 kW, Type 2 50 kW · Oundle Road
- [MFG BP Woodston · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-mfg-bp-woodston-uk) - CCS 50 kW, CHAdeMO 50 kW · Oundle Road
- [Best Western Plus, Orton Hall Hotel & Spa · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-best-western-plus-orton-hall-hotel-and-spa-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · The Village,
- [HU - Dobbies Peterborough · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-dobbies-peterborough-uk) - CCS 330 kW, CCS / CHAdeMO 330 kW · Phorpres Way · From 85p/kWh
- [Hampton Hub](https://ampmap.co.uk/charger/hampton-hub-uk) - CCS 160 kW
- [Dobbies Garden Centre](https://ampmap.co.uk/charger/dobbies-garden-centre-uk) - Type 2 · Phorpes Way

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/beko-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Beko (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
