# Beko

Web page: https://ampmap.co.uk/charger/beko-uk

Beko is an EV charging site in Rushden, North Northamptonshire, run by Beko and open 24 hours a day. Its 6 sockets reach up to 22 kW, with Type 2 at the top speed. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 16 charging sessions here over the last 30 days.

## Status

6 of 6 open at 22 Nov 2026, 13:00 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** NN9 6RJ
- **Area:** Rushden, North Northamptonshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.34836, -0.55445

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed | 1 free |
| Type 2 | 7 kW | 5 | Not listed | 5 free |

## Site information

- **Operator:** Beko
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Beko?

Up to 22 kW AC via Type 2.

### How many charging sockets does Beko have?

6 charging sockets: 5 × 7 kW Type 2, 1 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Beko open 24/7?

Yes - Beko is open 24 hours a day, 7 days a week.

### When is Beko busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Beko?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 16 observed charging sessions.

### Who operates Beko?

Beko is on the Beko network.

### How long does a Tesla Model Y Long Range take to charge at Beko?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Beko?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Beko?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Rushden](https://ampmap.co.uk/chargers/united-kingdom/north-northamptonshire/rushden)

## Chargers near this site

- [Raunds SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-raunds-sf-connect-uk) - CCS 150 kW, CHAdeMO 100 kW · London Road
- [Pod Point Raunds Town Council](https://ampmap.co.uk/charger/pod-point-raunds-town-council-2-uk) - Type 2 7 kW · Marshalls Road · From 55.2p/kWh
- [Stanwick Lakes AC1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-stanwick-lakes-ac1-uk) - Type 2 43 kW · Stanwick Lakes Visitor Centre
- [Newman Street · Believ](https://ampmap.co.uk/charger/believ-newman-street-uk) - Type 2 22 kW · Newman Street
- [Midland Road (Higham Ferrers) · Believ](https://ampmap.co.uk/charger/believ-midland-road-higham-ferrers-uk) - Type 2 22 kW · Midland Road (Higham Ferrers)
- [Shell Recharge Shell Thrapston](https://ampmap.co.uk/charger/shell-recharge-shell-thrapston-uk) - CCS 175 kW, CCS 150 kW · A14 Junction 13, Kettering · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/beko-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Beko (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
