Believ · EV charging site
Brackenbury Grove Junc Benbow Rd
Brackenbury Grive Junc Benbow Rd, Shepherds Bush, W6 0AU
Brackenbury Grove Junc Benbow Rd is an EV charging site in Shepherds Bush, Greater London, run by Believ. Both of its sockets are 22 kW Type 2. 1,582 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - White City (Tesla), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Believ
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Brackenbury Grove Junc Benbow Rd (Believ)?
Up to 22 kW AC via Type 2.
How many charging sockets does Brackenbury Grove Junc Benbow Rd (Believ) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Brackenbury Grove Junc Benbow Rd?
Brackenbury Grove Junc Benbow Rd is on the Believ network.
Where is the nearest charger with 50 kW or more to Brackenbury Grove Junc Benbow Rd (Believ)?
London, UK - White City (Tesla) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Brackenbury Grove Junc Benbow Rd (Believ)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Brackenbury Grove Junc Benbow Rd (Believ)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Brackenbury Grove Junc Benbow Rd (Believ)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Brackenbury Road
- ubitricity Distributed Energy Systems UK Ltd. 47 Brackenbury Road
- ubitricity Distributed Energy Systems UK Ltd. 222 Dalling Road, Outside 222
- Dalling Road
- ubitricity Distributed Energy Systems UK Ltd. 30 Brackenbury Road, Outside 30
- ubitricity Distributed Energy Systems UK Ltd. Road Dalling, Outside School
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 47 Brackenbury Road · 56p per kWh · 5 kW · 30 yd