Believ · EV charging site
Lawrence Road Jct with 194 S. Ealing Road
Lawrence Road Jct with 194 S., Ealing Common, W5 4RJ
Lawrence Road Jct with 194 S. Ealing Road is an EV charging site in Ealing Common, Greater London, run by Believ. Both of its sockets are 22 kW Type 2. 84 other charging sites are listed within a mile, and the nearest site with 50 kW or more is M4, Chiswick Flyover (BP Pulse), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Believ
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Getting there
- ,
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Lawrence Road Jct with 194 S. Ealing Road (Believ)?
Up to 22 kW AC via Type 2.
How many charging sockets does Lawrence Road Jct with 194 S. Ealing Road (Believ) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Lawrence Road Jct with 194 S. Ealing Road?
Lawrence Road Jct with 194 S. Ealing Road is on the Believ network.
Where is the nearest charger with 50 kW or more to Lawrence Road Jct with 194 S. Ealing Road (Believ)?
M4, Chiswick Flyover (BP Pulse) is 0.7 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lawrence Road Jct with 194 S. Ealing Road (Believ)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lawrence Road Jct with 194 S. Ealing Road (Believ)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lawrence Road Jct with 194 S. Ealing Road (Believ)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Junction Road
- ubitricity Distributed Energy Systems UK Ltd. 10 Olive Road, opp.
- ubitricity Distributed Energy Systems UK Ltd. 27A Junction Road, opp.
- South Ealing Road
- ubitricity Distributed Energy Systems UK Ltd. 24 Olive Road
- Rose Gardens
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 10 Olive Road, opp. · 56p per kWh · 5 kW · 0.2 mi