Believ · EV charging site
Mayfield Gardens
Mayfield Gardens, Greenford, W7 3AD
Mayfield Gardens is an EV charging site in Greenford, Greater London (W7 3AD), run by Believ. Both of its sockets are 22 kW Type 2. Amp Map lists 1 other charge point named Mayfield Gardens in Greenford. 31 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Roundabout, 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Believ
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Getting there
- ,
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Mayfield Gardens (Believ)?
Up to 22 kW AC via Type 2.
How many charging sockets does Mayfield Gardens (Believ) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Mayfield Gardens?
Mayfield Gardens is on the Believ network.
Where is the nearest charger with 50 kW or more to Mayfield Gardens (Believ)?
Shell Recharge Shell Roundabout is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mayfield Gardens (Believ)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mayfield Gardens (Believ)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mayfield Gardens (Believ)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Highland Avenue
- Greenford Avenue
- Grove Avenue
- ubitricity Distributed Energy Systems UK Ltd. 156 Bridge Avenue, opp.
- Bridge Avenue
- Mayfield Gardens
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 156 Bridge Avenue, opp. · 56p per kWh · 5 kW · 0.3 mi