Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BeWorks Test Team · EV charging site

BeWorks Test Team

Arnside Rd, Waterlooville, PO7 7UP

BeWorks Test Team is an EV charging site in Waterlooville, Hampshire, run by BeWorks Test Team and open 24 hours a day. It has a single 7 kW Type 2 socket. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Wellington Way Car Park (GeniePoint), 0.1 miles away.

Status

Not reporting

Checking status…

VerifiedLive status and details from BeWorks Test Team’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW1 connectorStatus unknown
BW EVCP 01Status unknown

Site information

Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the operator's appRFID card
Charger ID
BW EVCP 01

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at BeWorks Test Team?

Up to 7 kW AC via Type 2.

How many charging sockets does BeWorks Test Team have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is BeWorks Test Team open 24/7?

Yes - BeWorks Test Team is open 24 hours a day, 7 days a week.

Who operates BeWorks Test Team?

BeWorks Test Team is on the BeWorks Test Team network.

Where is the nearest charger with 50 kW or more to BeWorks Test Team?

Wellington Way Car Park (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at BeWorks Test Team?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at BeWorks Test Team?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at BeWorks Test Team?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: BeWorks Test Team · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.