Blink Charging · EV charging site
Ditchling Road, Lamp Column 73
Ditchling Road, Lamp Column 73, Brighton, BN1 6JJ
Ditchling Road, Lamp Column 73 is an EV charging site in Brighton, Brighton and Hove, run by Blink Charging. It has a single 4 kW Type 2 socket. 64 other charging sites are listed within a mile, and the nearest site with 50 kW or more is University Way SF Connect (BP Pulse), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ditchling Road, Lamp Column 73 (Blink Charging)?
Up to 4 kW AC via Type 2.
How many charging sockets does Ditchling Road, Lamp Column 73 (Blink Charging) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Ditchling Road, Lamp Column 73?
Ditchling Road, Lamp Column 73 is on the Blink Charging network.
Where is the nearest charger with 50 kW or more to Ditchling Road, Lamp Column 73 (Blink Charging)?
University Way SF Connect (BP Pulse) is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ditchling Road, Lamp Column 73 (Blink Charging)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ditchling Road, Lamp Column 73 (Blink Charging)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ditchling Road, Lamp Column 73 (Blink Charging)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.