# Halfway Park & Ride 1 · Blink Charging

Web page: https://ampmap.co.uk/charger/blink-charging-halfway-park-and-ride-1-uk

Halfway Park & Ride 1 is an EV charging site in Staveley, Derbyshire, run by Blink Charging. It has a single 22 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Eckington Way, S20 3GS
- **Area:** Staveley, Derbyshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.32809, -1.34430

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed |

## Site information

- **Operator:** Blink Charging
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Halfway Park & Ride 1 (Blink Charging)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Halfway Park & Ride 1 (Blink Charging) have?

1 charging socket: 1 × 22 kW Type 2.

### Who operates Halfway Park & Ride 1?

Halfway Park & Ride 1 is on the Blink Charging network.

### How long does a Tesla Model Y Long Range take to charge at Halfway Park & Ride 1 (Blink Charging)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Halfway Park & Ride 1 (Blink Charging)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Halfway Park & Ride 1 (Blink Charging)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Staveley](https://ampmap.co.uk/chargers/united-kingdom/derbyshire/staveley)
- [Cheapest charging in Staveley](https://ampmap.co.uk/chargers/united-kingdom/derbyshire/staveley/cheapest)
- [Blink Charging chargers](https://ampmap.co.uk/networks/blink-charging)

## Chargers near this site

- [Mosborough Hall Hotel · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-mosborough-hall-hotel-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · High Street
- [Crystal Peaks Shopping Centre · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-crystal-peaks-shopping-centre-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · Centre Management Suite
- [Water Sports · Joju Ltd](https://ampmap.co.uk/charger/joju-ltd-water-sports-uk) - Type 2 7 kW · Water Sports
- [Ridgeway Arms (Mosborough) · evyve](https://ampmap.co.uk/charger/evyve-ridgeway-arms-mosborough-uk) - CCS 75 kW, CHAdeMO 75 kW · Quarry Hill · From 85p/kWh
- [Elmwood Farm (Beighton) · evyve](https://ampmap.co.uk/charger/evyve-elmwood-farm-beighton-uk) - CCS 75 kW · Old Colliery Way · From 85p/kWh
- [Starbucks Beighton Chesterfield Road · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-starbucks-beighton-chesterfield-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Chesterfield Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/blink-charging-halfway-park-and-ride-1-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
