Blink Charging · EV charging site
Leyland Train Station Car Park, Leyland 3
Leyland Train Station Car Park, PR25 3LP
Leyland Train Station Car Park, Leyland 3 is an EV charging site in Leyland, Lancashire, run by Blink Charging. Both of its sockets are 7 kW Type 2. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Old Leyland Gates (Leyland) (evyve), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Leyland Train Station Car Park, Leyland 3 (Blink Charging)?
Up to 7 kW AC via Type 2.
How many charging sockets does Leyland Train Station Car Park, Leyland 3 (Blink Charging) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Leyland Train Station Car Park, Leyland 3?
Leyland Train Station Car Park, Leyland 3 is on the Blink Charging network.
Where is the nearest charger with 50 kW or more to Leyland Train Station Car Park, Leyland 3 (Blink Charging)?
Old Leyland Gates (Leyland) (evyve) is 0.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Leyland Train Station Car Park, Leyland 3 (Blink Charging)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Leyland Train Station Car Park, Leyland 3 (Blink Charging)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Leyland Train Station Car Park, Leyland 3 (Blink Charging)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Old Leyland Gates (Leyland)
- Morrisons Leyland
- South Ribble - Kings Cres CP
- The Woodsman, Leyland
- MFG
- Off Lancastergate Leyland
- Cheapest nearby
- Off Lancastergate Leyland · 65p per kWh · 7 kW · 0.7 mi
- Fastest nearby
- Old Leyland Gates (Leyland) · 75 kW · 0.3 mi