Blink Charging · EV charging site
Newham Parade 3
Newham Parade, Cheshunt, EN8 9NU
Newham Parade 3 is an EV charging site in Cheshunt, Hertfordshire, run by Blink Charging. Both of its sockets are 7 kW Type 2. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Kilsmore Way SF Connect (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Newham Parade 3 (Blink Charging)?
Up to 7 kW AC via Type 2.
How many charging sockets does Newham Parade 3 (Blink Charging) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Newham Parade 3?
Newham Parade 3 is on the Blink Charging network.
Where is the nearest charger with 50 kW or more to Newham Parade 3 (Blink Charging)?
Kilsmore Way SF Connect (BP Pulse) is 0.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Newham Parade 3 (Blink Charging)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newham Parade 3 (Blink Charging)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Newham Parade 3 (Blink Charging)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.