Blink Charging · EV charging site
Q-Park St Enoch, Glasgow 1
Maxwell Street, Glasgow, G1 4EQ
Q-Park St Enoch, Glasgow 1 is an EV charging site in Glasgow, Glasgow City, run by Blink Charging. It has a single 22 kW Type 2 socket. 51 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Newton Street Car Park - Taxis and PH ONLY (Chargeplace Scotland), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Q-Park St Enoch, Glasgow 1 (Blink Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Q-Park St Enoch, Glasgow 1 (Blink Charging) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Q-Park St Enoch, Glasgow 1?
Q-Park St Enoch, Glasgow 1 is on the Blink Charging network.
Where is the nearest charger with 50 kW or more to Q-Park St Enoch, Glasgow 1 (Blink Charging)?
Newton Street Car Park - Taxis and PH ONLY (Chargeplace Scotland) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Q-Park St Enoch, Glasgow 1 (Blink Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Q-Park St Enoch, Glasgow 1 (Blink Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Q-Park St Enoch, Glasgow 1 (Blink Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.