Blink Charging · EV charging site
South Street Car Park, Brighton
South Street Car Park, Brighton, Portslade, BN41 2LE
South Street Car Park, Brighton is an EV charging site in Portslade, Brighton and Hove, run by Blink Charging. Both of its sockets are 7 kW Type 2. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 63 victoria road (Blink Charging (Europe)), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at South Street Car Park, Brighton (Blink Charging)?
Up to 7 kW AC via Type 2.
How many charging sockets does South Street Car Park, Brighton (Blink Charging) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates South Street Car Park, Brighton?
South Street Car Park, Brighton is on the Blink Charging network.
Where is the nearest charger with 50 kW or more to South Street Car Park, Brighton (Blink Charging)?
63 victoria road (Blink Charging (Europe)) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at South Street Car Park, Brighton (Blink Charging)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Street Car Park, Brighton (Blink Charging)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at South Street Car Park, Brighton (Blink Charging)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.