Blink Charging · EV charging site
Stewart Park, Middlesborough
The Grove, Marton-in-Cleveland, Middlesbrough, TS7 8AR
Stewart Park, Middlesborough is an EV charging site in Middlesbrough, run by Blink Charging. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Southern Cross (Middlesbrough) (evyve), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Blink Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Stewart Park, Middlesborough (Blink Charging)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Stewart Park, Middlesborough (Blink Charging) have?
3 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates Stewart Park, Middlesborough?
Stewart Park, Middlesborough is on the Blink Charging network.
Where is the nearest other charger with 50 kW or more to Stewart Park, Middlesborough (Blink Charging)?
Southern Cross (Middlesbrough) (evyve) is 1.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stewart Park, Middlesborough (Blink Charging)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stewart Park, Middlesborough (Blink Charging)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stewart Park, Middlesborough (Blink Charging)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Broughton Avenue
- Rosebery Park Hospital
- Southern Cross (Middlesbrough)
- Morrisons Middlesbrough
- Morrisons Middlesbrough
- Bannatynes Health Club - Coulby Newham
- Cheapest nearby
- Southern Cross (Middlesbrough) · 85p per kWh · 75 kW · 1.2 mi
- Fastest nearby
- Southern Cross (Middlesbrough) · 75 kW · 1.2 mi